The following is suggested procedure for individual shield & armor
braid termination with environmental seal. (It is recommended that
actual samples of appropriate cable be used to determine exact dimensions).
- Temporarily assemble item 1* to connector.
- Insert cable into item 1* & bottom on connector. Mark armor
braid 3/4 inch behind item 1*.
- Dissassemble item 1* from connector. Slide all items up able in
sequence shown excepting items 2 & 3 (RFI rings).
- Cut armor braid at mark. Cut cable jacket 2-1/4 inches forward
of armor shield (see detail).
- Prepare individual shields in accordance with Sunbank assembly
procedure AP95.
- Slide item 3 on cable. Flare out individual shields, slide item 2
on cable & capture shields between items 2 & 3 secure with
screws trim shields if necessary.
- Terminate conductors in normal practice. Individual shield
termination should be no more than 1 inch behind connector
insert. (Shrink sleeving may be placed over RFI rings for
isolation feature).
- Slide item 1* down cable & tighten securely to connector. Slide
gland and ring into item 1*.
- Force armor braid back 3/4 inch. Tape to secure if needed.
- Engage rear adapter to item 1* & tighten securely. Slide armor
forward & flare over adapter cone. Slide ground ring into place
over braid & trim excess braid strand if necessary.
- Engage cable clamp tighten securely to rear adapter. Tighten
clamp saddle bars around armor braid.
* 45° & 90° assembly, item 1 includes adapter (item 1a) and elbow
(item 1b) sub assembled. (90 shown).

|