Home
Self Seating - our patented anti-decoupling solution
Flexible Conduit Systems
Rectangular Accessories
Composite Accessories
SE-UNI Adapter
Technical Solutions Representatives
Distributor Partners
Request for Quote
Catalogs
MIL-C-85049
FAA - PMA List
Build a Backshell
Quality Policy
Air-Dry Company
Job Opportunities
Parts Available Now and Distributor Inventories
Fiber Optic Connectors and Accessories

Search By Part Number


 

CLICK HERE TO VIEW A LARGER IMAGE

    SUGGESTED PROCEDURE
  1. Slide cable clamp and ground ring up cable. Temporarily assemble item #1* (compression ring, if applicable) to connector.
  2. Insert cable into item 1* and bottom on connector. Mark and trim cable jacket approx. 1/2 inch behind sleeve.
  3. Disassemble item 1* from connector and slide up cable with other components.
  4. Prepare individual or overall shield by flaring out or flatten and secure against the outer periphery of the cable or harness.
  5. Slide item 1* (compression ring if applicable) forward and thread onto connector. Tighten securely.
  6. Flare or comb shielding out over and around ground ring and secure with spot tie, as shown, see detail.
  7. Slide ground ring into place in tapered bore, at rear of sleeve.
  8. Slide clamp down and tighten on sleeve with approx. 35 inch lbs. This will insure a positive 360° grounding of the shielding and also provide a strain relief for cable or harness. * Item 1, 90° assembly includes: elbow (item 1a) cap (item 1b) and sleeve (item 1c) sub-assembled.


Josyln Sunbank Company LLC 1740 Commerce Way Paso Robles, CA 93446 Tel:(805)238-2840 FAX:(805)238-0241
email us Sales / Marketing