SUGGESTED PROCEDURE
- Place adapter components on cable as shown in exploded view.
Keep these components away from termination so they will not
interfere with subsequent assembly steps.
- Prepare individual shields in accordance with Sunbank assembly
procedure AP95. Fold back and spot tie. Allow additional
conductor length when utilizing connectors with front-insertable
contacts.
- Terminate conductors in normal practice.
- Assemble item 1* to connector and tighten securely. Slide first
FRI ring into bore at rear of item 1*.
- Untie individual shields and place evenly over second ring, push
second ring forward until shields are captured between first &
second rings. Engage cable clamp holding itme 1*. Tighten 35 in.
lbs. to 55 in. lbs. Spot tie and trim excess shielding. For 3 ring
dual termination types, having tied back both individual and
overall shields and completed steps 1 thru 4.
- Untie individual shields and place evenly over second RFI ring.
Push second ring forward until shields are captured between first
and second rings. Spot tie & trim excess shielding. Untie overall
shielding & place evenly about third ring. Push third ring
forward, until shielding is captured between second and third
rings. Engage cable clamp, holding item 1* tighten 35 in. lbs. to
55 in. lbs. Spot tie & trim excess shielding. See detail.
* Item 1, 90° assembly includes: elbow (item 1a), cap (item ab) and
sleeve (item 1c) sub-assembled.

|